Engineering · sample capital board
Capital · drainage · right-of-way
Give Public Works and Planning a shared picture of streets, water, stormwater, and ROW jobs — from bid notice to inspection hold. Engineering sits with City Administrations on the official city site; this desk is the working tracker.
Capital & drainage
| Job | Scope | Corridor | Phase | Status |
|---|---|---|---|---|
| ENG-11 | Water line replacement | SH 290 / Business 290 sample | Construction | In progress |
| ENG-14 | Street rehab package | University Drive approaches | Bid | Advertised |
| ENG-17 | Drainage study | East-side outfall | Study | On hold |
| ENG-19 | ROW restoration | After utility cut — west | Inspection | Punch list |
| ENG-21 | Sidewalk infill | City Hall to campus edge | Design | Design |
Project inquiry
For contractors, ROW, drainage complaints, and capital-job questions. Bid documents and legal notices stay on the city’s published administrations / bid pages.
Closed capital jobs become Public Works maintenance assets. Permits that need civil review land here from Planning.
This tracker is the internal picture. Advertised bids, addenda, and awards must match prairieviewtexas.gov.